London Olympics 2012

Overlay contractor to GL Events

“The equestrian centre, designed and installed by Better Green was the jewel of the crown of the 2012 overlay contract.”

– Xavier Becker, Project Director

Scope of Works…

  • Camera platforms

  • Photographer hides

  • Triple decker ceremonies holding structure. Fire, walling and staircases

  • Synchronised swimming platforms

  • First of its kind temporary equestrian veterinary centre with stables

  • OVR structures including underneath the Grandstand at LVC

  • DDA ramps and platform cladding

  • Test events gymnastic fit out and judges platforms

Previous
Previous

Rugby World Cup GB